My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52253
DRMS
>
Back File Migration
>
Report
>
REP52253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:51 AM
Creation date
11/27/2007 1:18:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
5/7/1991
Doc Name
APRIL MONTHLY OPERATING REPORT
From
BATTLE MOUNTAIN GOLD CO
To
GC DODSON
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BATTLE MOUNTAIN GOLD COMPANY <br />INTEROFFICE CORRESPONDENCE <br />May 7, 1991 <br />To: G. C. Dodson <br />From: J.C. Lenz <br />Subject: April Monthly Operating Report <br />1. Mill Operations <br />1.1 Crushing and Grindinq <br />!~ <br />BATTLE MOUNVUN <br />GOLD COMPANY <br />The crusher experienced one major shutdown during the <br />month of April to change the belt on CV-O1. The mill <br />continued to operate at reduced tonnage during this <br />shutdown. Probable cause of the belt tear was an impact <br />idler clip that had been disfigured. <br />25,471 wet tons of ore were ground during April. <br />Operating availability of the plant was a disappointing <br />33.9. Major downtime was caused by a damage assesment <br />of the ball mill ring and pinion gears, re-configuration <br />of the LCI drive on the SAG mill, and by defective <br />reactors in the harmonic filters. Mill operations at <br />reduced tonnage resumed on April 29th. <br />1.2 Leaching and Adsorption <br />Calculated feed grades were 0.0389 Au oz/ton and 0.0708 <br />Ag oz/ton. Solid tails were 0.0045 Au oz/ton and 0.0442 <br />Ag oz/ton. Gold and silver recoveries respectively were <br />88.43$ and 37.57. <br />1.3 Tailings Impoundment <br />The reclaim water pumps were commissioned this month. <br />Minor work remains to be done to the fencing at the <br />seepage collection pond. <br />1.4 Desorption and Refining <br />
The URL can be used to link to this page
Your browser does not support the video tag.