Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year aoo5 <br />Golden Eagle C-81-013 Basin Resources, TNC. <br />mine name permit # Permittee <br />Address: 2 North Cascade Ave., 14th Floor, Colorado Spr;nas. rn 80903 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The ovation of the acreage reported <br />under each land status category and year of seeding ('rf appliceble) should be cleady and accurately <br />identified on a map inGuded with the report. <br /> <br />Land Status Ca o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 59 .45 + 0 = 59.45 <br />Acres backf~lled and raded 59.45 + 0 = 59.45 <br />Acres to soiled 59.45 + 0 = 59.45 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateaorv below. Do not include acres That have achieved final, Phase III release. <br /> last Years This Greater <br /> Cumulative Calendar Cumulative t0 years or than f 0 <br /> Total ear Total' less ears' <br />Acres seeded" 59.45 + 0 = 59.45 = 59.45 + <br />'include,rf necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine. the total number of acres disturbed 66.17 and the total number of acres: <br />Phase I released 5 9 .45 Phase II released 5 R . 1 ~ Phase III released ~ ~ ~ <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to recamation but yet to be completed n <br />For Government Pertorrnance and Results Act <br />Acreage in bng-term mining or reclamation facilities s 0 <br />Acreage in active mining areas' <br />'(exdude aces where Phase III release has been achieved) <br />' Indudes haul and access roads; temporary dams and impoundments; permanem dams and impoundments; diversion and <br />collector ditches, water and air mondoring sites; topsotl stockpiles: overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, baling, and processing areas; railroads; coal conveyors; nonbackfilbd and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fiAS, and valley fills; ventilation shafts and entryways: <br />and noncoal waste disposal area (garbage dumps and coal combustion by-producLS disposal areas). <br />' Includes pins, topsoil stripped areas in advance of pits, and seal not baddilled and graded <br />