My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP51807
DRMS
>
Back File Migration
>
Report
>
REP51807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:27 AM
Creation date
11/27/2007 1:10:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
Report
Doc Date
2/25/2003
Doc Name
Annual Report
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pennittee Name: Lakewood Brick and Tile Co. Page 2 <br />Permit No: M-79-045 <br />Operation Name: Church Pit <br />Anniversary Date: 02/28/2003 <br />(3) Clay -Mining will continue in Stage I or Stage II, no new azea will be disturbed this yeaz <br />because we aze mining in the azea stripped in previous yeazs. Mining will deepen the bottom <br />of the mine into the clay veins exposed in the past and advance the face to the north as <br />approved in the reclamation plan. Processing will continue in the Clay Plant Site Area in <br />Stage 0 (purple). The clay storage on the east side of Stage II continues (tan). It is blended <br />with the clay from this mine at our brick plant in Lakewood. <br />Gravel -Mining will resume in Stage A and will progress to the east and north. Processing <br />will be done in the azea east of the old Clay pit, As the perimeter of the mine is reached <br />sloping will begin as approved in the approved plan. Growth medium will be stockpiled <br />along the mine perimeter for use in reclamation. <br />{4) No reclamation is called for during the nett yeaz. However, backfilling will continue on the <br />slopes in the old clay pit. The waste material from gravel processing will be used to slope the <br />south mine slope from the original level to the pit floor. We will continue to fill the north <br />slope of the old clay pit and begin to do sloping on the east side, if the gravel operator <br />removes the overburden pile next to the face on that side. If the opportunity to sell rock from <br />the southwest overburden pile occurs, that removal will continue as well. <br />(S) CURRENT CONTACT <br />Thomas J. Murray (3031238-5313 <br />1325 Jay St. FEDERAL TAX ID. <br />Denver, Co 80215 <br />The effective date of all information contained herein is February 20, 2003. Enclosed is a <br />check for $688.00 to cover the Annual Fee. Please date stamped the copy attached to indicate your <br />receipt of this Annual Report, and the Annual Fee, <br />Respectfully Submitted, <br />LAKEW D BRICK ND E COMPANY <br />i~ <br />~omas J. Murray, <br />Vice President <br />cc Chazles McKay -Church Ranch <br />Perry McKay <br />Siri Olsen, Attorney at Law <br />Tim Pike -Centennial Aggregates <br />David Field, Jefferson County Geologist <br />Steve O'Brian, Environmem, Inc. <br />file <br />RECE~ VED <br />FEB 2 5 2003 <br />Division at Minerals and CeoloBY <br />o:~wrot oocavwHUasuwKearooowumoa.~w <br />
The URL can be used to link to this page
Your browser does not support the video tag.