Laserfiche WebLink
<br /> <br />Cotter Coreoration <br />Mr. David C. Shelton <br />September 30, 1985 <br />Page Three <br />cost for purchase and placement of topsoil, seeding, mulching,fertilizing, <br />labor, and fuel was included in Exhibit L of the mining permit. The major <br />difference between what is proposed in the current permit and what we hope <br />to accomplish with a technical revision is backfilling the access road <br />rather than topsoiling it. The cost associated with topsoil purchase and <br />placement over 2.5 acres, six inches deep, (based on figures in Exhibit L <br />of the permit) is $10,083.33. The cost for backfilling 4,600 feet of the <br />access road is $18,124.00 (see attachment #2 ). Accordingly, Cotter's surety <br />bond will be increased by $8,041.00 to reflect the difference bebdeen these <br />two reclamation costs. Based on the foregoing, Cotter Corporation requests <br />Board approval of this technical revision and surety bond adjustm?nt. <br />Please contact me if you have any questions regarding this transmittal. <br />Sincerely, <br />SL/rg <br />Enclosure <br />~~ / C.,-- <br />Timothy C. Smith <br />Director of Environmental <br />Affairs <br />File No. 8186K8630-10-3 <br />