Laserfiche WebLink
Division of Mining and Geology <br />Department of Natural Resources <br />November 18, 1992 <br />Page 2 <br />As required by the recently-approved TR-06, Table 1 lists the <br />calculated cyanide values from the process point samples. <br />Calculated free cyanide and WAD cyanide were based on the methods <br />described by ASCI in its report dated June 1992. <br />Should you have any questions regarding the data enclosed herein, <br />please feel free to give us a call. <br />Yours truly, <br />~~~ <br />Ralf Topper <br />Senior Hydrogeologist <br />RT/pl <br />Enclosure <br />lcc: A. Walter Wise, Esq. <br />Battle Mountain Gold Company <br />MCorp Plaza, Forty-Second Floor <br />333 Clay Street <br />Houston, Texas 77002 <br />lcc: Ms. Alana Scott <br />Battle Mountain Resources <br />P.O. Box 310 <br />San Luis, Colorado 81152 <br />lcc: Dean Massey, Esq. <br />Parcel, Mauro, Hultin and Spaanstra <br />1801 California Street, Suite 3600 <br />Denver, Colorado 80201 <br />lcc: Mr. Andre Douchane <br />Battle Mountain Gold Company <br />5670 Greenwood Plaza Boulevard, Suite 106 <br />Englewood, Colorado 80111 <br />lcc: Mr. Art Lefler <br />Battle Mountain Gold <br />5670 Greenwood Plaza <br />Englewood, Colorado <br />lcc: Ms. Anne Baldrige <br />Battle Mountain Gold <br />5670 Greenwood Plaza <br />Englewood, Colorado <br />Company <br />Boulevard, Suite 106 <br />80111 <br />Company <br />Boulevard, Suite 106 <br />80111 <br />