1 Kvaerner Metals Project No. sossoo <br />General Specification No. GC-18 <br />' Geosynthetic Lining <br />Seaming of joints shall be done by extrusion process, using the manufacturers <br />recommended procedures and equipment. The surfaces of joint shall be cleaned of <br />moisture, dust, dirt, debris and oxidation, not more than one hour prior to welding. <br />' Geonet shall be deployed over the lower layer of HDPE on the bottom of the basin and <br />on the slopes. It shall be placed in relaxed condition with no overlapping of panels. <br />Geonet does not need to extend into anchor trenches. <br />5.0 WORKMANSHIP <br />Prior to commencing the work, Contractor shall certify, in writing, that the surface on <br />which the HDPE will be installed is acceptable. Thereafter, it shall be the Contractor's <br />' responsibility to maintain the prepared soil surface. Any damage to the subgrade <br />caused by this installation shall be repaired at Contractor's expense. The soil surface <br />shall be observed daily by the Contractor to evaluate the surface condition. Changes in <br />' the supporting soil surface caused by natural conditions shall be reported to the <br />Engineer. <br />' HDPE sheets shall not be placed on subgrade soil which has become softened by water. <br />The Contractor shall provide for dewatering and for drying of the subgrade as required <br />during installation of the liner. <br />t All joints shall be tightly bonded and shall have at least the strength of the base material. <br />Any liner area showing damage due to penetration by foreign objects or distress from <br />' rough subgrade shall be replaced or covered and sealed, with an additional layer of <br />material, as directed by the Engineer. Any portion of liner damaged before or during <br />installation shall be removed or repaired at Contractors expense. <br />' Personnel working on the HDPE shall not smoke, or wear damaging shoes, as <br />determined by the Engineer, nor engage in other activities which could damage the liner. <br />Heavy foot-traffic contact with the HDPE liner shall be minimized. <br />t The Engineer shall have the authority to order an immediate stoppage of the work due to <br />inclement weather, the use of improper installation procedures, or for any reason which, <br />in his sale opinion, may result in a defective liner. <br />Installation shall be performed under the direction of a field engineer who has installed a <br />minimum of 2,500,000 square feet of flexible lining material. The field engineer shall be <br />provided by the Contractor, and shall be in absolute charge of the liner installation. <br />The welding equipment used shall be capable of continuously monitoring and controlling <br />the temperatures in the zone of contact where the machine is actually fusing the lining <br />material, to ensure changes in weather conditions will not affect the integrity of the weld. <br />No "fish mouths" shall be allowed within the seam area. Where"fish mouths" occur, the <br />material shall be cut, overlapped and an overlap extrusion weld shall be applied. All <br />' welds on completion of the work shall be tightly bonded. <br />' J11069'~WP~SPECISTRUCTGC185PG.000. Rav ~O~ 9 PnntsE JUna 3. 1999 <br />