Laserfiche WebLink
Kvaerner Metals <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />LJ <br /> <br />I~ <br />J <br />1 <br />Project No. 306900 <br />General Specification No. GC-01 <br />Site Work <br />The road surface shall be finished to a visually smooth and uniform line and grade, <br />without ponding, with surface deviation not exceeding 2-1/2 in. within 100 feet. <br />11.0 CLEAN-UP <br />Contractor shall clean up the work as it progresses from day to day, and shall remove <br />from the adjoining premises, all waste materials and rubbish. When the work is finished, <br />Contractor shall remove, from the site of the work, all tools and machinery for which, in <br />the opinion of the Engineer, he or his subcontractors are responsible. Rubbish and waste <br />material shall be removed from the site and disposed of in approved landfill or in areas <br />on site approved by the Engineer. Contractor shall leave the work free and clear from all <br />obstructions and hindrances. <br />Contractors work area shall be raked clean and graded to neat appearance and shall <br />provide drainage preventing accumulation of water. <br />J:gOfi91WPl5PECl9TRUCT00019PC.OOC. Rer. ~t~ 13 - PrvmteE JUry 2l, 1999 <br />