Laserfiche WebLink
Ms. Sandra Brawrr <br />© January 7, 1999 <br />Page ? <br />4.0 ROADS <br />The widths of both the main haul road and the access road across Bush Draw mere reduced <br />during 1995. The remaining road segments have been sized as permanent and temporary <br />light-use roads, respectively, for post-reclamation access. No additional road disturbance or <br />reclamation has occurred subsequent to 1996. <br />5.0 TOPSOILING AND REVEGETATION <br />No additional topsoiling or revegetation activities occurred during 1998. However, <br />remediation on an area of excessive rill and gullying was initiated during the late fall of 1998. <br />Remediation will continue in the spring/summer of 1999. <br />Selective spraying was completed to control and eliminate minor infestations of <br />Canadian/musk thistle. Sprayed areas will be inspected next spring to evaluate weed control <br />success and re-sprayed as necessary to assure effective control. Map 1, 1998 Reclamation <br />Map, portrays the areas sprayed. <br />6.0 DRAINAGE AND SEDIMENT CONTROL <br />No new ponds, ditches, or other drainage and sediment control structures were constructed <br />during 1998. The sediment control structures (ponds) were upgraded by placing riprap along <br />the water line of the embankments. The disturbance area associated with existing <br />unreclaimed areas of the sedimentation ponds and ocher drainage and sediment control <br />structures is approximately 19.1 acres. <br />During 1998 Kerr completed routine main[enance on existing drainage and sediment control <br />structures, including inspection of all ponds, ditches, and culverts and cleaning of ditches and <br />culverts as necessary to remove any excess accumulations of sediment or debris and maintain <br />effective function. <br />7.0 TOPSOIL STOCKPILE <br />No topsoil recovery or replacement activities occurred during 1998, therefore, none of the <br />remaining topsoil stockpiles were disturbed. The six remaining topsoil stockpiles, as shown <br />on the 1998 Reclamation Map, cover approximately 5.8 acres. <br />8.0 SURFACE FACILITIES <br />As shown on the 1998 Reclamation Map, disturbance associazed with the remaining surface <br />facilities totals approximately 13.8 acres. <br />9.0 LOADOUT AREA <br />The Loadout area had some facility demolition conducted during 1998 and will undergo <br />significant demolition and reclamation during 1999. No surface backfilling or regrading was <br />conducted in 1998. <br />10.0 GRAZING <br />No lives[ock grazing occurred during 1998 due [o problems in coordinating with the local <br />rancher who has been involved in the grazing program in the past. Jim Mossman, who <br />