Laserfiche WebLink
dl nrr aline <br />© 2003 Reclmrsnkon ReJ~a7 <br />FeGrnary 7d, 200d <br />huge d <br />11.0 GRAZING <br />EFCI obtained DMG approval for grazing, but coordination problems with the ranch operator <br />limited actual grazing to two days (500 head) in mid-October (10/14-10/15). <br />12.0 REVEGETATION SUCCESS EVALUATION <br />Revegetation success sampling was completed in 1999 on the pre-1986, 1995, and 1996 reclaimed <br />areas. The results of this sampling are contained in a report prepared by ESCO Associates Inc. <br />dated February 2000. This report was forwarded to the DMG. This evaluation included cover, <br />annual production, shrub density and species diversity/composition. Based on the sampling <br />results, revegetation in the 1995 and 1996 reclamation areas satisfies the applicable revegetation <br />success standards. Revegetation in the pre-1986 reclaimed area satisfies the applicable revegetation <br />success standards for annual production and species diversity/composition but not for cover or <br />shrub density. Kerr will continue managed grazing operations on reclaimed areas and anticipates <br />that the combination of grazing, progressive vegetative establishment from the initial revegetated <br />community, and natural reinvasion will enhance cover and shmb density. Kerr will continue to <br />monitor revegetation success and will conduct follow-up revegeta[ion success sampling and <br />evaluation to assess the effectiveness of progressive vegetative reestablishment Year 9 and 10 <br />revegetation success monitoring would occur during 2005 and 2006. <br />13.0 BOND RELEASE <br />An application for partial bond release (Phase I for Loadout Area and Phase II for 720 Pit and Pit <br />1 Areas) was filed with the DMG in August 2000. A bond release inspection of the release areas <br />was held on May 22, 2001 and the DMG subsequently approved the application For partial bond <br />release on June 26, 2001. An application for partial liability release was also filed with the DMG in <br />May 2001 for the Marr Pit Axea (pre-1986 reclamation). "I'he liabsliry release inspection for this <br />area was conducted on September 12, 2001 and the DMG approved the partial liability release in <br />June 2002. <br />14.0 TOTAL DISTURBANCE SUMMARY <br />The following table summarizes the total disturbance at the Marr 1~Iine and Loadout The lands <br />included in this table are categorized by current use and/or state of reclamation. <br />SUMMARY OF DISTURBANCE <br />Mine Area <br />Reve etated 1999 6.5 <br />Facilities, Roads and Sediment Control 34.6 <br />Topsoil Stock files 3.3 <br />Reclaimed pre-1999 345.3 <br />TOTAL 389.7 acres <br />Loadout Area <br />Revegetated 1999 5.3 <br />Facilities, Roads and Sediment Control 6.4 <br />TOTAL 11.7 acres <br />