Laserfiche WebLink
<br />RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 121 1-CO-09-01370-01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD N0.9 EXCAVATION) <br /> <br />INSPECTOR SIGNA <br />INSPECTOR TITLE: L~i,~. ~lpy . <br />Under the supe Sion of Gary Buchan, Colorado P.E. #'3 <br />This inspection was conducted to comply with DMG Rule 4.09. I (I 1). <br />This inspection was conducted to evaluate: <br />/A. Stability of fill (quarterly inspection) <br />it/~? B. Critical construction periods: <br />1. Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />fi le:l:\EMEN V IRONMENTAL\EMPIRE\IN SPREP\ W ASTEPI LEFORM.DOC <br />5. Revegetation <br />