Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 12] I-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. ]211-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />DATE/TIM& . <br />INSPECTOR SIGNATURE: <br />INSPECTOR <br />Under the supervision of Gary Buchan, Colorado <br />This inspection was conducted to comply with DMG Rule 4.09.1(1 I ). <br />This inspection was conducted to evaluate: <br />~A. Stability of fill (quarterly inspection) <br />~B. Critical construction periods: <br />1. Removal of all organic materiaVtopsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />h <br />file:l:\EMENVIRONMENTAL\EMPI RE\iNSPREP\ W ASTEPILEFORM.DOC <br />