My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50256
DRMS
>
Back File Migration
>
Report
>
REP50256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:18 AM
Creation date
11/27/2007 12:48:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996049
IBM Index Class Name
Report
Doc Name
SUBSTITUTE SUPPLY PLAN FOR THE L G EVERIST MARYLAND CREEK RANCH AGGREGATE OPERATION M-96-049
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Substitute Supply Plan for the <br />1 r FvPrist ApQrPpat~narafinn <br />STATEMENT OF TEMPORARY SUBSTITUTE SUPPLY PLAN <br />The groundwater exposed as a result of the proposed MCR operation is water that is tributary to <br />the Blue River. Depletions to this source will be the result of evaporation from exposed <br />groundwater, operational losses from retainage in the aggregate, and dust control occurring <br />during the fvst yeaz with similaz losses, concrete batching, and truck washing occurring during <br />the second yeaz. The resulting annual depletion to the Blue River below the operation is <br />estimated to be 13.96 acre-feet the first yeaz and 44.36 acre-feet the second year. <br />L.G. Everist will dry up a total of 85.5 acres of historically irrigated lands for purposes of <br />transferring the consumptive use credits of 138.5 acre-feet to meet out-of-priority depletions to <br />the Blue River. In addition, L.G. Everist will use its available 3.9 acre-feet of water from Green <br />Mountain Reservoir and 4.0 acre-feet of water from Dillon Reservoir to meet non-irrigation <br />season depletions. Finally, L.G. Everist will construct an Augmentation Pond during the first <br />two yeazs of operation to replace non-irrigation season depletions not covered by Green <br />Mountain Reservoir or Dillon Reservoir. <br />Administration <br />Adequate accounting will be provided on a monthly basis, or as otherwise required, to the <br />Division Engineer and Water Commissioner, and will show both the estimated depletions and the <br />amount of replacement water which will be provided. Table 9 of this report is a blank <br />accounting form which will be used for accounting submittals. <br />Well Per-nit <br />Attachment 8 is a gravel pit well permit application which is submitted as part of this substitute <br />supply plan. An original signed version has been sepazately attached with this report. <br />881-025.110 Wright Water Engineers, Inc. Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.