Laserfiche WebLink
SURFACE WATER HYDROLOGY <br />The mine plan area is drained by two ephemeral drainages, Maitland and Gordon Arroyos. Surface <br />flows in the arroyos occur only when significant runoff saturates the permeable alluvium. This only occurs <br />when spring snowmelt is wmbined with precipitation events or intense thunderstorms in the summer and <br />' fall. During the remainder of the year, the arroyos are dry. Minor drainages in the area such as Gordon <br />and Maitland Arroyos are influent, while major drainages such as the Huerfano and Cucharas Rivers are <br />effluent. <br />Because oC the ephemeral nature of Maitland and Gordan Arroyos, no quantity or quality measurements <br />o[ surface runoff have been made to date. However, five crest stage gauges were installed in January 1983. <br />The locations of these gauges are tabulated below and shown on Figure 1. <br />1 <br />Maitland Arroyo SW-1 T275,R67W, Sec 36, SWl/4,NW1/4 <br />' Tributary to Maitland SW2 T27S,R67W, Sec 36, NWU4,SW1l4 <br />Arroyo <br />' Maitland Arroyo SW-3 T27S,R67W, Sec 25, SEl/4,SEU4 <br />Gordon Arroyo SW-4 T27S,R67W, Sec 25, NWl/4,NW1/4 <br />' Gordon Arroyo SW-5 T27S,R67W, Sec 25, NWl/4,NW1/4 <br />' Because of the existing conditions and maintenance costs, only Station SW-5 located downstream on <br />Gordon Arroyo was monitored during 1988 as per the revised conditions of stipulation No. 1. During the <br />visits to the site, no surface flows were observed in the arroyo. However, during the September visit to the <br />' site, the gauge was missing. A flow of two to three feet was measured from the high water line on the <br />adjacent bridge. The gauge was either lost becatue of this flow event or because of vandalism. The gauge <br />was replaced during that same visit to the site. <br />' During the 1988 NPDES monitoring, no surface water discharge was recorded over the year from the <br />surface facilities sedimentation pond. Reporting forms were sent to the Colorado Department of Health <br />during quarterly reporting periods. CMLRD also received copies of these reports. Inspection of the <br />' sediment pond was conducted in March, June, SeptembeY and December. Inspection reports are contained <br />in Appendix 3. No major structural, erosional or operational problems were noted during the year. <br />