Laserfiche WebLink
:f <br /> <br />RECLAMATION COSTS <br />Henderson Mine <br />March 1987 <br />Many affected areas are being re vegetated but are not considered totally <br />reclaimed. Estimated costs and concomitant financial warranty for seich areas <br />are adjusted downward as reclamation occurs and upward to cover additional <br />disturbed areas. Because of the continuously changing acreage and status of <br />affected land, the Board stipulated that reclamation costs be updated every <br />two years in conjunction with submittal of the annual report and map. We <br />have refined our acreage estimates, our methods, and our costs. The esti- <br />mated costs of reclaiming all anticipated disturbances through 1988 is $4.412 <br />million. <br />A. Site Type Cost Calculations: <br />1. Mine site (computed for 15 acres), mostly comprised of a fragmented <br />rock growth medium: <br />Man-days Labor/Equip. Material Total <br />Site preparation 5 $3,750 $ 0 $3,750 <br />Spread and haul SS* 20 2,080 5,400 7,480 <br />Spread and haul WC* 30 3,120 7,800 10,920 <br />Stockpiling SS and WC 6 624 0 624 <br />Seed 2 208 1,410 1,618 <br />P 0 fertilizer <br />s 4 416 780 1,196 <br />Mix <br />in SS and WC 6 624 0 624 <br />4,500 trees 45 4,680 2,250 6,930 <br />600 shrubs 6 624 390 1,014 <br />Maintenance fert., <br />one application 3 315 180 495 <br /> Total $34,651 <br />$ 2,310 <br />per acre <br />*SS = sewage sludge <br />WC = wood chips <br />i9s7 RP<<~.r.~t~a„ <br />Cost Catc~.loled <br />