Laserfiche WebLink
i~~~~~99/E® <br />FEB 2 t 1002 <br />Division of Minerals and Geology <br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year_2oQi <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of all of the areas reported <br />should be clearly depicted on a map included with the report. <br />Mine Name: IJow(2 ~( (f'i NE <br />Permit Number: C- 81- 03 g7 <br />Permittee: t'lna~le 'ICCSw RG2s L~-D <br />Address: j~.C7. ~nX 4g.3 <br />l`~RoniA, ~'o~ 8~Y28 <br />For work accomplished this calendar year only <br />Total number of acres disturbed _~_ <br />Total number of acres backfilfed and graded ____~_ <br />Total number of acres topsoiled _~ <br />Total number of acres permanently seeded or planted _~' <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For previous years <br />Total number of acres previously re-seeded <br />(Indicate on a map acreage and date of seeding or individual, previously re-seeded areas) <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities' ~~~ <br />Acreage in active mining areas 2~ <br />Acreage re-seeded for greater than 10 years .~_~ <br />'Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitodng sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads: coal conveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />~ Includes pits, topsoil stripped areas in atlvance of pits, and spoil not backfilled and graded <br />