My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP49671
DRMS
>
Back File Migration
>
Report
>
REP49671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:53:41 AM
Creation date
11/27/2007 12:38:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1995
Doc Name
APPENDIX B.4 PIEZOMETERS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' JUN. -21' 951~YEU) 15:13 BMGC TEL 303 72l 6813 <br />1 <br />BATTLE MOUNTAIIJ RESOURCES. WC. <br />June 13, 1994 <br />Mr. Larry Oehler <br />Division of Minerals and Geology (~A°'~ <br />' 1313 Sherman Stzeet, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. (BMRI) - Sao Luis <br />' DMG Permit xo. M-88-112 <br />Completion of Approval Terms for TR-16 <br />' Deaz Mr. Oehler: <br />As outlined in the January 14, 1994 TR-16 approval letter, <br />the Division required the installation of additional <br />piezometers and the placement of set-back markers for the <br />water pool. <br />' Stipulation No. 1 stated: <br />' "The operator will install and monitor a minimum of ten <br />piezometers, with five installed along the crest o£ the <br />embankment raise and five installed along the upstream <br />' toe of the embankment raise. The piezometers are to be <br />installed and monitored in accordance with a design and <br />protocol to be approved by the Division_ A design for <br />the piezometers must be submitted for review and <br />approval by February 15, 1994. The piezometers must be <br />' installed by March 15, 1994 and the tailings surface <br />elevation in the lowez pond may not exceed one foot <br />' beyond the elevation at the base of Raise 1 at the time <br />of piezometer installation." <br />As outlined in the approved TR-16, ten additional <br />piezometers were installed in the tailings disposal area on <br />March 11-13, 1994. The design and location of the <br />piezometers was approved by the Division on March 10, 1994. <br />' Five piezometers were installed along the crest o£ the Phase <br />II, Anise I embankment raise. These piezometers are <br />identified as P11-P15. The coordinates for the embankment <br />piezometers are: <br />' P11 N 205,275 <br />E 2,037,757 <br />' P12 N 205,458 <br />E 2,037,698 <br />' P13 N 205,655 <br />E 2,037,633 <br />A SUBS/D/ARY OF BA77Lf, wOUMTAIN rOID COMPAA7 <br />P,O. 80X 310 SAN LOIS,COLORADO AI132a1?IO (7191673.7]62 FAX (7141672.3M3 <br />P. 004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.