My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP49651
DRMS
>
Back File Migration
>
Report
>
REP49651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:53:40 AM
Creation date
11/27/2007 12:38:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Report
Doc Date
3/11/1991
Doc Name
1990 ANNUAL RECLAMATION REPORT PN C-80-003
From
H-G COAL CO
To
MLRD
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. REVEGETATION MONITORING <br />Requirement <br />The following monitoring plan has been developed to determine <br />the initial success of reclamation practices. <br />- Herbaceous vegetation sampling will be conducted during <br />the peak of the growing season, late June to early <br />August. <br />- Reclaimed areas in the second growing season will be <br />sampled individually. Reclaimed areas in the third <br />growing season will be combined and sampled as one area. <br />- Herbaceous cover, herbaceous production, diversity and <br />shrub density information will be collected. <br />- The sampling techniques will be comparable to those for <br />sampling of reference areas. <br />- The sampling conducted for the monitoring plan will not <br />necessarily meet statistical adequacy. A number of <br />samples will be collected to obtain information that is <br />representative of the conditions of the revegetated area. <br />- Where possible, all sampling sites will be randomly <br />located in reclaimed areas. <br />- No specific or general revegetation criteria will be set <br />for the period prior to bond release; however, the data <br />will be used to monitor trend of vegetation <br />establishment. <br />- If the revegetated community has no major deficiencies <br />after the third year of sampling, further sampling will <br />be conducted every third year thereafter. <br />Response <br />Initial vegetation monitoring of reclaimed areas has confirmed <br />the success of initial reclamation efforts. Refer to previous <br />Annual Reports for details of this sampling. Further sampling <br />is now required only every 3 years, therefore, sampling was <br />not required at HG in 1990. <br />However, since the revegetation efforts visually appeared to <br />meet cover requirements for Phase II bond release, sampling <br />was conducted to confirm our observations and to meet partial <br />bond release criteria. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.