My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP49590
DRMS
>
Back File Migration
>
Report
>
REP49590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:53:34 AM
Creation date
11/27/2007 12:37:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Report
Doc Date
11/14/1995
Doc Name
QUALITY ASSURANCE AND QUALITY CONTROL MANUAL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FIELD SEAM FAILURE <br />Should failure occur through excessive leak down over the scheduled time period, check <br />both ends of seam to ensure proper seal and retest. Should failure reoccur, check the top <br />fusion seam by applying a constant flow of air pressure to void or air channel. Mix a <br />strong solution of liquid detergent and water and apply an ample amount to the top fusion <br />weld. Any failure or leak will be indicated by continuous bubbles appearing. <br />If no failure appears in the top fusion seam area, check systematically by isolating <br />random sections of the seam. Then retest each section by pressure testing until the leak is <br />located. Repair failed seam azea by extrusion welding the outside edge of the top fusion <br />weld between azeas of failure. Then vacuum test repair seam azea. All repairs in <br />accordance with ILPI Quality Assurance/Quality Control Manual. <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.