Laserfiche WebLink
<br />Finalize field cutout sample sizes; <br />Review seam testing procedures; <br />Review repair procedures; and <br />Review precautions to be taken against clay cracking (surface desiccation). <br />This meeting shall be documented by a person designated at the beginning of the <br />meeting, and minutes shall be transmitted to all parties. In certain instances, the <br />Resolution Meeting and Pre-Construction Nteeting may be combined, provided that all <br />provisions of 1.3.1 and 1.3.2 aze addressed. <br />1.3.3 Progress meetings <br />A daily progress meeting shall be held between the Earthwork Nfanager, ILPI, the Project <br />Manager, and any other concerned parties. This meeting shall discuss current progress. <br />Any matter requiring action which is raised in this meeting shall be reported to the <br />appropriate parties. <br />1.3.4 Manufacturing Plant Visits <br />A geomembrane manufacturing plant visit may be carried out by a representative of the <br />Owner or his designated alternate if he so chooses. <br />GEOivIEMBRaNE 1VIAi~1UFACTURING AND DELIVERY <br />2.1 Manufacturing <br />2.1.1 Geomembrane Raw Material <br />The raw material shall be fast quality polyethylene resin containing no more than 2% <br />clean recycled polymer by weight, and meeting the following specifications: <br />For HDPE: <br />Specific Gravity (ASTM D 792 Method A or ASTM D 1505): ?.935 prior to the <br />addition of carbon black. <br />Nfelt Index (ASTM[ D1238 Condition 190/2.16):0.05 - 0.3 g/10 min. <br />Quality control testing shall be carried out by the manufacturer to demonstrate <br />that the product meets this specification. <br />10 <br />