Laserfiche WebLink
:_ ,, <br />ANNUM. RF,PnRT <br />According.to C.R.S. 3432-116(3), and C.R.S. 3432.5-116(3)(x), on the anniversary date of the permit eacN~year, <br />the operatorshall submit a report and a map showing the extent of current disturbances to affected land;+" ~ . '=.. <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated fo:oceur .' <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach "such '-. <br />a report and;map taendosed annual report form. (An adequately labeled map that clearly delineates and.includes. <br />the above elements may suffice for a written report.) <br />If your opezationpis subject to the provisions of Temporary Cessation as defined in the Act and Rules, ytiu.must ' <br />provide with the.Annual Report the following information as required by 3 CCk 407-I, 40?-~3, and Rubs' <br />1.13.7(1)(x):. <br />a <br />- (i)-°the•eondition of the operation az the-[ime of cessation; -= - _ ~ - - - ~- - . - <br />(tt) whatspac~caneasures have been and will be implemented to comply with reclamation ;performance., . ` I <br />standards and Environmental Protection Plan requirements, if they are part of your approved application .and <br />(iii) plans for resumption of mining operations. <br />Please provide`the~additional following information with your Annual Report, as applicable: <br />(u) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1), pruvide an updated statement '' <br />regarding-the sufficiency of the value of the Financial Warranty, specifically: <br />- ~ ~ Vi(i) ~ ~P.er the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(x), provide an~updated ~~ <br />statement regarding the sufficiency of the value of the financial warranty. Specifically; <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance,. salvage <br />credit, and fits[ priority liens on project related fixtures. <br />(ii) -Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(b), permits secuit:d with~a '::-. <br />'.Deed of Ttustor.a Security Agreement, the operator shall submit an update, by a qualified . <br />"independent appraiser; indicating any changes in property value, and a statement summarizing <br />any circumstances which cosy affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the pioperry subject to either of these instruments. The report shall also provide <br />_. "'. - - proof that them are no past-due property razes. - - <br />(i).. Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured.with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form. , <br />of a-balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does-not exceed ten percent (10%) of the bank's capital surplus accoun[s. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority-I:ien on any fixtures and Equipment, the operator shall provide a report insufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment:.' <br />(b) Pei the requirements of 2 CCR 407-1,407-4; and Rules 1.15(1)(c); all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit) <br />