My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48810
DRMS
>
Back File Migration
>
Report
>
REP48810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:36 AM
Creation date
11/27/2007 12:24:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Report
Doc Date
7/28/1989
Doc Name
1988 ANNUAL HYDROLOGIC REPORT
From
NEW CASTLE ENERGY CORP
To
MLRD
Annual Report Year
1988
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCEC-1988 Hydrology Rpt -4- July, 1989 <br />has been suggested by the Water Quality Control Division of the <br />Colorado Department of Health. <br />2.2 Discussion of the Data <br />Data collected during 1988 is consistent with previously collected <br />data for these monitoring sites. The concentrations of the <br />reduced list of constituents fit within the natural variability <br />recorded during the previous few years. <br />Hydrographs for the various monitoring wells located up and <br />down -gradient from the proposed facilities are included. The 198'8 <br />data appear to be consistent with past trends. Monitoring holes <br />OW -3L, OW -7, OW -12, and OW -16 continue to be dry during the <br />monitoring period. <br />2.3 Future Plans <br />NCEC will restart the quarterly field parameters and annual <br />quality sampling when monetary conditions improve for the company. <br />The sampling frequency will increase to monthly field paramters <br />and quarterly quality samples when it appears that activities will <br />resume at the site. <br />In order to improve the quality and reliability of the data, <br />several plans will be implemented, as follows: <br />New Castle Energy Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.