Laserfiche WebLink
BMRI San Luis Project <br />CDMG Annual Report <br />March 20, 2003 <br />Page 3 <br />Table I- San Luis Project Existing Mine Land Disturbances (2002) <br /> <br />Area Permitted <br />Disturbance <br />acres Actual <br />Disturbance <br />acres Completed <br />Reclamation <br />acres Remaining <br />Reclamation <br />acres <br />East Pit 20 20 20 0 <br />West Pit ]]0 100 54.3 28.7 <br />Waste Rock A 0 0 0 0 <br />Waste Rock B 18 IS 18 0 <br />Waste Rock C 30 28 28 0 <br />Waste Rock D 42 42 42 0 <br />South Waste <br />Rock 50 35 35 0 <br />MiII Area 26 26 4 22.4 <br />ESI Leach Pad 8 8 8 0 <br />Test Leach Pad ]0 ]0 0 10 <br />Borrow Area 17 10 0 70 <br />Roads 30 20 8 20.8* <br />Tailin Facilit 192 192 166.8 25.2 <br />Tu[al Area 547 SOY 391.9 117.1 <br />*Roads include areas that were previously accounted for within other facility lootprints, but since the majority of the <br />facilities have been reclaimed leaving only the roadway surface, this roadway acreage has been separated and accounted <br />(br as roadway disturbance, were as previously it might have been included with the Waste Rock Faci]ityC or tailing <br />facilit}' disturbance iden[itiartion. Therefore, the roadway disturbance identification has been increased. <br />Site Monitoring and Reporting <br />Quarterly water sample collection and analysis in accordance with TR-06, TR-15, TR-26, <br />TR-31, and the monitoring program QA/QC took place throughout the year. Laboratory <br />analytical reports were transmitted to the Division upon receipt from the laboratory. <br />Surface water, ground water and process point water sampling was conducted in <br />accordance with Technical Revision 31 (TR-31). Piezometer water level measurements <br />were conducted throughout the year in accordance with the permit frequency schedule. <br />Laboratory analytical reports were transmitted to the Division upon receipt from the <br />laboratory. <br />Lysimeters were inspected quarterly and reported to the Division. The lysimeters remained <br />dry throughout the year. <br />Groundwater sampling and analysis of the San Luis town wells and Shalom Ranch well was <br />conducted throughout the year on a more frequent basis than required by the CMLRB <br />