Laserfiche WebLink
Third Party Oversight 3 Water, Weste & land, Inc. <br />t San Luis Mine January 10, 7993 <br />' 1.4 SCOPE OF REPORT <br />Results of the oversight work outlined in the previous section are presented in this report. <br />This report was organized to address the key technical issues associated with the Raise I <br />Expansion, but keep discussion of the issues as brief as possible. For continuity, major sections <br />of the report generally correspond to the major tailings disposal facility components, rather than <br />' the work tasks conducted for the third-party review. The documents that were reviewed as part <br />of this work are listed in Section 7. <br />' Daily field engineer reports from the construction oversight work are presented as Appendix <br />A to this report. Weekly reports provided to DMG are included as Appendix B to this report. <br /> <br /> <br /> <br />t <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />