My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48449
DRMS
>
Back File Migration
>
Report
>
REP48449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:09 AM
Creation date
11/27/2007 12:19:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
1/31/1994
Doc Name
THIRD PARTY TECHNICAL OVERSIGHT REPORT FOR THE SAN LUIS PROJECT TAILINGS DISPOSAL AREA PHASE II RAIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Larry Oehler <br />I' December 14, 1993 <br />Pape 2 <br />' Measured field densities were achieved throughout each lift. Previous lifts were not being <br />scarified prior to placement of successive lifts. This occurred only above the 8599 <br />~ (approximate elevation) lift. <br />' QUALITY ASSURANCE TESTING AND REVIEW <br />• Liner Cover <br />' The area in Acre 36 where the tested liner cover thickness was approximately 1 5 inches (24 <br />inch minimum thickness required) was covered with an additional 6 to 12 inches of material. <br />' Additional material was placed over approximately % acre at and around the test area. <br />Additional stockpiles of liner cover material were placed at random locations around the <br />periphery of the tailings impoundment. These stockpiles are to be used to replace eroded <br />sections of liner cover within the existing impoundment. <br />• Miscellaneous Issues <br />Piezometer installation had not commenced by the time WWL left the sight. TI7e upstream <br />and downstream faces of the embankment had yet to receive their final grading. An <br />' additional trip to the site may be required to verify piezometer installation. <br />The November 30 letter from Alana Scott to you is still in the review process. Comments on <br />' the letter will be include in our final report. <br />If you have any questions concerning the information contained in this letter, pIE!ase contact <br />1 Clint Strachan or me. <br />Yours sincerely, <br />' WATER, WASTE & LAND, INC. <br />' Douglas O. Gibbs, P.E. <br />Project Engineer, Geotechnical/Mining Division <br />1 <br /> <br /> <br /> <br />,1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.