Doc Date
1/31/1994
Doc Name
THIRD PARTY TECHNICAL OVERSIGHT REPORT FOR THE SAN LUIS PROJECT TAILINGS DISPOSAL AREA PHASE II RAIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ~ ~. WATER 2629 Redwing Rd. Suite 200, Fort Collins, Colorado 80526 <br />~;~ (303)226-3535 <br />~,~ "" WASTE fax (303) 226-6475 <br />iI & LAND <br />i~ <br />December 14, 1993 WWL N390 <br />VIA FACSIMILE <br />' State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />' Denver, CO 80203 <br />Attention: Larry Oehler <br />1 Environmental Protection Specialist <br />Subject: Battle Mountain Resources Inc. -San Luis Mine <br />' Weekly Construction Activity Update - 12/7/93 through 12/9/93 <br />Dear Larry, <br />' Contained in this letter is information concerning WWL's observations of construction <br />activities and our review of current construction quality assurance testing procedures and <br />' results. This information was collected over the period from December 7 through December <br />9, 1993. <br />' CONSTRUCTION ACTIVITIES <br />On the 5'" of December (Sunday) no work was done at the site. On December 6'"liner cover <br />material was placed, but no embankment material was placed, as BMRI workers did not haul <br />any material from the pit or borrow area. Weather conditions were dry and relatively warm <br />during construction activities. The construction activities during this period are outlined <br />below. <br />' • Liner Cover <br />All of the liner cover material has been placed. All of the small (less than 1 acre) areas which <br />' had not been covered at the end of the last work period have now been covered with <br />sufficient material. <br />' • Embankment Construction <br />At the end of this work period, approximately 80 percent of the 8603 (approximate elevation) <br />' lift had been placed. The night shift on the 8'" was to finish placing this lift and place a <br />majority of the final lift 18605). As substantial borrow material of good quality •emained at <br />the pit and there appeared to be no problems with achieving densities. I left the site for Fort <br />Collins on Wednesday night (the 8'"). <br />' Consulting Enginrrrs and Scientists <br />