Doc Name
THIRD PARTY TECHNICAL OVERSIGHT REPORT FOR THE SAN LUIS PROJECT TAILINGS DISPOSAL AREA PHASE II RAIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lerry Oehler <br />' November 29, 1993 <br />PeQe 2 <br />Prior to Serrot beginning their patching activities, pre-weld destructive tests were performed. <br />' Pre-weld tests were conducted at the beginning of each day, after any shutdown, and after <br />approximately four hours of patching. Quality assurance tests results collected by SRK were <br />in agreement with quality control test results collected by Serrot. Patching of one non-passing <br />' seam and several tears in the liner are being completed today. <br />• Embankment Construction <br />' On the main embankment, the second and third lifts were completed and approximately 25 <br />percent of the fourth lift had been placed and compacted. The top of the fourth lift is <br />approximately two feet above the top of the existing embankment. Construction was slowed <br />due to a change in borrow material characteristics. On the afternoon of November 22, <br />material coming from the pit was deemed unsuitable far embankment construction (by SRK). <br />The unsuitable material was removed from the pit, another area of the pit was blasted, and <br />embankment construction resumed on the morning of November 24. Overall material <br />characteristics have remained the same as outlined in WWL's first weekly report.. Densities <br />appear to have been achieved throughout each lift. No frozen materials are being incorporated <br />' into the fill. Previous lifts are being scarified before placement of successive IifTS. <br />• Liner Cover <br />' Several acres of liner cover was placed during this period in addition to completior of the haul <br />road around the north end of the impoundment. SRK instructed the contractor to install <br />additional drains on the north side of the impoundment to decrease drain spacing. On the <br />morning of November 22, I measured the spacing between two adjacent drains tc be 40 feet <br />at the top of the impoundment and approximately 150 feet at the old to new liner tie-in <br />' (where the new VLDPE was tied into the existing geosyntheticl. After pointing out the <br />spacing to Glenn Buyer of SRK, he informed the contractor, who then added several extra <br />drains across the slope to reduce the spacing to approximately 60 feet at the maximum <br />' spacing. I believe that if the spacing or lack of drains had not been mentioned to SRK, the <br />contractor would have installed the drainage layer in that area without sufficient drains. The <br />contractor has been more cognizant of drain spacing since that morning. <br />' • Miscellaneous <br />' Tailings deposition has been switched to the eastern impoundment. Water accumulating at <br />the base of the newly lined areas from snow melt and precipitation is being pumped across <br />the haul roads and into the existing impoundments to prevent the overnight formation of ice. <br />' QUALITY ASSURANCE TESTING AND PROCEDURES <br />' WWL has received and reviewed a summary of the field tests conducted up to November 23, <br />on the soils and VLDPE. Actual test results from the field and a summary of laboratory tests <br />have not yet been received, but are in the process of being prepared by BMRI. <br />' According to DMG's letter to BMRI (Ken Kluksdahl) dated November 2, 1993, the requirement <br />of a minimum of one gradation per half acre (material already placed) and one gradation per <br /> <br /> <br />