My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48210
DRMS
>
Back File Migration
>
Report
>
REP48210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 1:04:00 PM
Creation date
11/27/2007 12:15:47 PM
Metadata
Fields
Template:
IMP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 866 -3567 <br />FAX 303 8328106 <br />Iti <br />l�� <br />March 18, 1992 <br />John Henderson <br />Vranesh & Raisch <br />P.O. Box 871 <br />Boulder, CO 80306 <br />Dear John: <br />STA OF COLORADO <br />;ov ..Romer <br />Govemor <br />fAcnael B. Long. <br />Division Director <br />Thank you for returning the consent form authorizing safeguarding activities <br />on Tenderfoot Mining Company property. <br />In regard to the mine openings located near the Mollie Kathleen Tourist Mine, <br />we have obtained consent from Mr. Dennis Lanning to safeguard the mine <br />openings with a safeguard that was specially designed to accommodate concerns <br />regarding ventilation. These openings were brought to our attention by the <br />Director of the Colorado Division of Mines, Joe Nugent, because of their <br />degree of danger and proximity to the tourist mine. We planned to include <br />these openings in the project that we are going to complete this summer. <br />However, we may not be able to do the project until next spring, if at all. <br />Mr. Lanning will approve the work only if it is completed prior to May 1, <br />1992. The AML Program cannot complete the project work until after June 1st, <br />at which time we receive grant money from the Office of Surface Mining. We <br />will continue to negotiate with Mr. Lanning regarding the construction. Joe <br />Nugent also plans to contact Mr. Lanning. <br />I will keep you advised on this matter <br />Sincerely, <br />Julie Lake Annear <br />Realty Specialist <br />JLA /sj <br />Thank you for your cooperation. <br />2007F <br />
The URL can be used to link to this page
Your browser does not support the video tag.