Laserfiche WebLink
<br />BOWIE RESOURCES LIMITED <br />Bowie No. 1 Mine <br />Coal Mine Waste Bank Inspection - 4"' Quarter 2000 <br />On December 1, 2000, I performed a quarterly visual inspection of the Bowie No. 1 <br />Mine coal mine waste bank in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. All organic material and topsoil has been removed <br />ahead of the waste bank founding. The pile and surrounding area were dry and no <br />seepage was noted around the pile. <br />No coal mine waste was deposited in the pile during the quarter. There were no <br />drainage alterations and no new bench construction. No topsoil was salvaged during <br />the quarter. <br />The design of the waste disposal area is presented in Volume 6A. To the best of my <br />knowledge and belief, based on my inspection of the pile and previous inspections by <br />professional engineers, the coal mine waste bank has been constructed in accordance <br />with the approved plan. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the mine haul road located below the pile. However, a failure of the <br />pile would probably not be a hazard to human life. <br />Recommend maintenance: None •ap0 REGr~•~ <br />~Q~' S~ ~E ~ S j'~ `~~P°a <br />~~~, Ao. ~ iL~ ~ <br />T ;James E. Stov~e~' <br />:90 ~.E. No. 1 ~~ <br />•: ~0 =AI ~ ~~i ~ <br />