My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48010
DRMS
>
Back File Migration
>
Report
>
REP48010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:49 AM
Creation date
11/27/2007 12:12:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
1/22/2001
Doc Name
PN C-81-038 4TH QUARTER 2000 POND INSPECTION REPORTS & GOB INSPECTION REPORTS
From
BRL
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BOWIE RESOURCES LIMITED <br />Bowie No. 1 Mine <br />Reclaimed Coal Mine Waste Bank Inspection - 4"' Quarter 2000 <br />On December 1, 2000, I performed a quarterly visual inspection of the Bowie No. 1 <br />Mine reclaimed coal mine waste bank in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The pile and surrounding area were dry. Drainage <br />was adequate. No seeps or spoil springs were noted. The pile has been reclaimed. <br />The pile blends in with the surrounding area so it is difficult to determine the areal <br />extent of the reclaimed waste pile. Records indicate 15" to 24" of non-toxic material <br />was placed over the coal mine waste. The reclaimed pile supports a good stand of <br />vegetation. <br />According to the permit, this waste pile was filled to capacity in August 1983 and <br />reclaimed. In the spring of 1985, spontaneous combustion was detected. Topsoil and <br />cover material were excavated and the hot spot was removed. The area was <br />apparently reclaimed again during the Summer of 1988. <br />The design of the waste disposal area is presented in Volume 6A. To the best of my <br />knowledge and belief, based on my inspection of the pile and previous inspections by <br />professional engineers, the coal mine waste bank has been constructed in accordance <br />with the approved plan. According to previous inspections, the pile was constructed <br />with 1.5H:1 V outslopes. The outslopes were stable. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the sediment pond located below the pile. However, a failure of the <br />pile would probably not be a hazard to human lif~,oe..e <br />•04T~ p ~R f Glsl~ a <br />Recommend maintenance: None o.~e`~3 - ` '~. ~o <br />~c, P ~. =• ~., o ~ <br />i : ~ .:° a <br />~L <br />.. <br />o,,'aame{s~E' .~StQv r Date <br />,~~.~aAC E~iF°0 <br />•...•• <br />
The URL can be used to link to this page
Your browser does not support the video tag.