.Y <br />Page 2 <br />Response: The missing flow data has been added and two copies of <br />the revised pages are attached. <br />5. In the future CYCC should report the flow values for Sites 700 <br />and 900 as per the approved hydrologic monitoring plan. <br />Response: Flow data for Sites 700 and 900 has been added and two <br />copies of the revised pages are attached. <br />6. Why were bedrock wells sampled for full suite analysis during <br />June rather than April or May as per the approved plan? <br />Response: The sampling was delayed until June due to poor field <br />conditions and DMG and OSM oversite inspections in May. <br />Two copies of all new materials have been provided. If you have <br />any additional questions, please contact us at your convenience. <br />Best regards, <br />,~?~~~- <br />Ashley House <br />Environmental Specialist <br />attachments <br />