My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47880
DRMS
>
Back File Migration
>
Report
>
REP47880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:39 AM
Creation date
11/27/2007 12:10:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Report
Doc Date
5/1/1980
Doc Name
AMENDED APPLICATION FOR RADIOACTIVE MATERIAL LICENSE FOR ORE SORTING FACILITY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />15. There will be approximately 1200 tons of waste from concrete <br />pads, dirt surrounding the pads and sludge from ponds N1 •jnd <br />#2. This is the equivalent of three days output from the mine, <br />'i and can be easily accommodated in the 200 acre Main Impoundment <br />at Canon City. <br />6.2 Decommissioning Costs <br />The cost of decontamination procedures are outlined in this ~:ection. <br />This does not include the $200,000 allocated for land reclamat ion at. the <br />Schwartzwalder Mine. Reference section E and L of the Schwart zwalder Mine <br />permit approved by the Colorado Mined Land Reclamation Board i n January, 1978. <br />Copies of the MLRB permit, excluding confidental information, are available <br />at the offices of the Colorado Mined Land Reclamation Board. <br />• <br />a. Wash and steam clean equipment, structures and <br />buildings - estimated 180 manhours at $10/j r. $ 1,800 <br />b. Dismantle, paint and remove equipment.- <br />530 manhours at $10/hr. 5,300 <br />c. Break-up concrete, clean-up edges and load <br />in trucks - 80 manhours at $10/h r. 800 <br />d. Equipment rental, cranes, etc. 10,000 <br />e. Loader operation during clean-up 3,500 <br />f, Paint - 200 gallons at $15/gal. 3,00() <br />g. Miscellaneous tools, slings, etc. 3,00(1 <br />h. Trucks to move equipment to salvage yard - <br />5 truck days at $300/day 1,50(1 <br />i. Truck haul of an estimated 1200 tons of <br />contaminated material to Canon City at <br />20 cents/ton mile 31,20(1 <br />• Total $59,10(1 <br /> <br />6-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.