Laserfiche WebLink
<br />Munger <br />Sampling appears to have been conducted in compliance with permit requirements. <br />Required analytical parameters were provided for the specified laboratory parameters. Two <br />flow events were captured at the lower site on Munger Creek (SW-31• Field parameters <br />were obtained for only one of the flow events at SW-3. There were no flow events <br />captured at the two sites on upper Munger Creek (SW-6 and SW-71. <br />Summary <br />Monitoring, reporting, and hydrologic impact assessment appears in general to have been <br />conducted in accordance with permit requirements, and consistent with previous reports. <br />DMG PHC review is requested. <br />