Laserfiche WebLink
~' <br /> <br /> <br />ANNUAL REPORT <br />-, <br />' INSTRUCTIONS <br />~1 <br />According [o C.R.S. 34-32-I'16(3),'and C.R.S. 34-32.5-116(3)(x), on the anniversary date of the permit each year, <br />the operator shall submit a report aiid a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and.during the~preceding year, new disturbances that are anticipated to occur <br />dunng the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the .Aimual Report the following itiformauon as required by 2 CCR 407- I, 407-4, and Rules <br />I.13.7(1)(x): <br />(I) the condition of the operation a[ the time of cessation: <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application; and <br />(uQ plans for resumption of mining operations <br />Please provide the additional following information with your Annual Report, as apphcable~ <br />(a) Per the requirements of ^_ CCR 407-1, 407-4, and Rules L IS(1), provide an updated statement <br />regarding the sufficiency of the value of the Fina»cial Warranty, specifically: <br />(I) Per the requirements of'_ CCR 407-I, 407-4, and Rules L 15(1)(x), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and secunty agreernents, self-insurance, salvage <br />credit, and first priority liens on project related £.xtures. <br />(ii) Per the requirements of 2 CCR 407- I, 407-4, and Rules 1. I5(I)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />The report shall also provide proof that there are no pas[-due property taxes. <br />(iii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide docwnentation in the form <br />of a balance sheet, certified by a Certified Public Accoumant, demonstrating that the <br />Letter of Credit does not exceed ten percent (I O;o) of the batik's capital surplus accounts. <br />(iv) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures aiid Equipment, the operator shall provide a report in sufficient <br />detail to fully describe ttie condition, value, and location of all pledged fixtures <br />and egwpment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules L li(I)(c), all motutoring information <br />required as part of the approved permit application, to include Environmental Protection Plan. <br />(Please note that if you are not a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved permit.) <br />