My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47552
DRMS
>
Back File Migration
>
Report
>
REP47552
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:12 AM
Creation date
11/27/2007 12:04:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
9/30/1981
Doc Name
Initial Waste Rock Pile - Prelim. Design Recs
From
Geo-Hydro Consulting, Inc.
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ii <br />'d~3.2 RECOMMENDED MONITORING <br />' The monitoring wells installed in borings No. 2 and 3 should be monitored <br />throughout the construction and operation of the waste rock pile. <br />All the parameters marked with an x on the Baseline Water Quality Monitor- <br />' ing Requirements (Plate 4) should be tested for in an initial sample taken from <br />boring No. 2. All these parameters should also be tested for in an initial <br />sample taken from boring No. 3 if ground water is ever detected in this <br />' monitoring well. These parameters should be tested for quarterly (every three <br />months) throughout the construction and operation of the waste rock pile. Test <br />results should be submitted to the CMLRB. <br />After one year (four quarterly reports) of baseline monitoring the CMLRB <br />should be asked to review the laboratory testing program. They may at that time <br />approve the deletion of some of the parameters being tested for. <br />The following parameters should be monitored and measured in the field <br />month]y during the construction and operation of the pile. <br />J o Water level (the absence of water should be noted if the hole is dry) <br />o pH <br />o Conductivity at 25°C <br />7 o Temperature <br />1 <br />The results of this monthly monitoring should be included in the quarterly <br />report to the CMLRB. <br />Water samples should be collected for analysis using a bailer type sampler. <br />Water should be bailed out of the well to the extent possible prior to sampling <br />j to insure that the sample collected is representative of the aquifer. <br />1 <br />1 <br />~~wuo coHwinrw. we <br />
The URL can be used to link to this page
Your browser does not support the video tag.