Laserfiche WebLink
<br /> <br />1992, 1993, 1994 AHR Review <br />Bear Coal Company <br />April 19, 1995 <br />Page 5 <br />upstream and downstream sampling location to collect quality <br />and quantity data on a regular basis. <br />3. Page 7 of the Findings Document dated April 29, 1994 states <br />that there are several domestic wells located along the river <br />in alluvial material. Please specify where these wells are <br />located so the Division can determine if there is a <br />possibility the wells could be impacted. The location of <br />these wells should also be included in the permit. <br />4. As the depth to water in the alluvial wells is taken from the <br />top of the well to the top of the water, please provide the <br />amount of casing above ground and the total depth of the well. <br />The Division was unable to locate well completion diagrams for <br />the alluvial wells, which should be provided as well. <br />5. BCC should provide a short narration or mine map detailing <br />where mining occurred during the AHR reporting period, so that <br />the Division may correlate any potential impacts with mining <br />in the area. <br />7. Units should be included on the Alluvial Well Monitoring Field <br />Data table and the French Drain - Upper table. Please provide <br />a revised page for the 1994 AHR. <br />Please respond to the Division's comments and questions on or <br />before June 2, 1995. Please call if you have any questions. <br />Sincerely, <br />l%~\~~ <br />Anthony J. Waldron <br />Environmental Protection Specialist <br />cc: David Berry <br />Christine Johnston <br />CEJ/033AHR93.2 <br />