Laserfiche WebLink
MarrMine-7002 Reclamation Report <br />© ]anuary 17, 2003 <br />Page 3 <br />These areas were reseeded to the permanent seed mixture during 2001 and additional intexseeding <br />was completed in 2002. <br />In 2002, EFCI completed a program to identify, plug, seal, and reclaim a number of old <br />exploration boreholes and alluvial monitoring wells, primarily in the Kerr North Area north of the <br />County Road. Work was completed in late October 2002. <br />8.0 TOPSOIL STOCKPILES <br />There are approximately 3.3 acres of topsoil stockpiles remaining at the Mine Area. No material <br />removal or reclamation was conducted in these areas in 2002. <br />9.0 SURFACE FACILITIES <br />As shown on the 2002 Reclamation Map, the remaining permanent facilities (roads, buildings, and <br />ponds) in the Mine Area cover approximately 35 acres. Permanent facilities in the Loadout Area <br />cover approximately 6 acres. <br />10.0 LOADOUT AREA <br />Final reclamation activities were completed for the Loadout Area (approximately 5 acres) during <br />1999. The Loadout Area was re-seeded in October 2000 and good growth was evident during the <br />bond release inspection in May 2001. <br />11.0 GRAZING <br />EFCI had planned to conduct grazing activities during 2002, however due to drought conditions, <br />EFCI and the DMG determined that grazing might not be beneficial and EFCI did not proceed <br />with planned grazing. <br />12.0 REVEGETATION SUCCESS EVALUATION <br />Revegetation success sampling was completed in 1999 on the pre-1986, 1995, and 1996 reclaimed <br />areas. The results of this sampling were contained in a report prepared by ESCO Associates Inc. <br />dated February 2000. This report was forwarded to the DMG. This evaluation included cover, <br />annual production, shrub density and species diversity/composition. Based on the sampling <br />results, revegetation in the 1995 and 1996 xedamation areas satisfies the applicable revegetation <br />success standards. Revegetation in the pre-1986 reclaimed area satisfies the applicable revegetation <br />success standards for annual production and species diversity/composition but not for cover or <br />shrub density. Kerr will continue managed grazing operations on reclaimed areas and anticipates <br />that the combination of grazing, progressive vegetative establishment from the initial revegetated <br />community, and natural reinvasion will enhance cover and shrub density. Kerr will continue to <br />monitor revegetation success and will conduct follow-up revegetation success sampling and <br />evaluation to assess the effectiveness oEprogressive vegetative reestablishment. <br />13.0 BOND RELEASE <br />An application for partial bond release (Phase I fox Loadout Axea and Phase II for 720 Pit and Pit <br />1 Areas) was filed with the DMG in August 2000. A bond release inspection of the release areas <br />was held on May 22, 2001 and the DMG subsequently approved the application for partial bond <br />u~u-rqw..e~xmei,.,m,.,e,,.~ex,e.,.,<ovau <br />r/r~/oilq. <br />