Laserfiche WebLink
~ ~ ~ <br /> DENSITY-COMPACTION TEST RESULTS <br />PROJECT: ALMA PLACER M INE PROJECT NO.: 1-4561-11191-10 DATE: 6/12/90 <br />LOCATION:pARK COUNTY, COLORADO REPORTNO.: 6 TIME: 9.5 HOURS <br />SOURCE: BERM CONSTRUCTION SAMPLE NO.: 1 ENGINEERING TECHNICIAN: DEANGELIS <br />TEST DEPTH PROCTOR OPTIMUM DRY <br />NO. LOCATION OR DENSTI'Y MOI <br />TENT <br />CO DENSITY CO OMPACTIO SOIL TYPE <br /> ELEVATION PCF N pCF % A~T• R%Q• <br /> <br />40 STA 1+50, Inside of Berm 93.5' 133.5 7.8 128.4 5.8 96 95+ AND, silty, w/gravel <br /> rown (SW-SM) <br />41 STA 2+75, Inside of Berm 94.5' 129.3 6.1 97 " <br />42 STA 2+00, Inside of Berm 94.5' 130.6 5.9 98 " <br />43 STA 1+00, Outside of Berm 90.0' 129.0 6.1 97 " <br />44 STA 3+25, Outside of Berm 90.0' 130.3 5.7 98 " <br />45 STA 1+25, Inside of Berm 95.0' 128.8 7.3 96 " <br />46 STA 2+00, Outside of Berm 91.5' 130.4 5.8 98 " <br />47 STA 3+00, Inside of Berm 96.5' 129.4 5.2 97 " <br />48 STA 2+25, Inside of Berm 96.5' 130.1 5.3 97 <br />49 STA 3+50, Inside of Berm 95.0' 131.2 5.5 98 " <br />EQUIPMENT: TYPE OF TEST: Nuclear Density <br /> <br />Push Cats <br />- 2 <br />Loader - <br />1 TEMPERATURE: 45-55° F <br /> <br />Compactors <br />- 2 WIND• 5-10 mph <br />Backhoe - 1 PRECIPITATION: None <br />Water Truck - 1 <br /> DENSITY -COMPACTION TEST RESULTS <br /> ~~ GEOTECNNICAL, WTERIALS i <br /> J ENVIRONMENTAL CONSULTANTS <br />nrR.7 <br />