Laserfiche WebLink
October 2000 -54- 003-2191 <br />• of water could then be followed back to the refuse where it could be contained at <br />the source. <br />c) Control measures would include containing the seepage in a lined evaporation <br />pond, applying the water to the depository, or treating the water in an <br />appropriate manner. <br />If nuisance conditions are confirmed beyond the site boundary it would probably be <br />related to wind blown debris or unauthorized dumping. In any case, adequate personnel <br />would be mobilized to accumulate waste and return it to the depository site. <br />(Ivq The amounts and sources of water to be used on site for the control of nuisance <br />conditions, fire protection, constructionpurposes and personnel use <br />Potable water will be hauled to site for personnel use. Sanitary services will be <br />i provided by portable chemical toilets. <br />A 3,000 to 4,000 gallon water truck will be available for use at the depository as needed <br />to control nuisance conditions and for fire protection. The water for the water truck will <br />be obtained from the on-site well completed in the Lazamie Fox Hills Formation for <br />which the owner has water rights. Water will be hauled via highway style water truck <br />from this point to the operation as necessary to control nuisance conditions and for fire <br />protection. <br />3.3.3 Quality Assurance and Quality Control Reports <br />Quality assurance and quality control reports shall be developed and implemented for <br />all engineered structures at the depository. Engineered structures and the respective <br />quality control reports aze explained below. <br />• <br />V00/'_191RI915NaliaPermiil000.doc Sedalia Recycling Center and Depository <br />