My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46523
DRMS
>
Back File Migration
>
Report
>
REP46523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:49:45 AM
Creation date
11/27/2007 11:12:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979221
IBM Index Class Name
Report
Doc Date
12/20/2000
Doc Name
PERMIT APPLICATION SEDALIA RECYCLING CENTER AND DEPOSITORY DOUGLAS CNTY COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2000 -47- 003-2191 <br />• Legal Description: <br />Township 7 South, Range 68 West, 6'" P.M. <br />Section 11: S''/z SE'/,, Section 14:N'/z NE'/< <br />(B) Area site, in acres: <br />The site encompasses 160 acres. <br />(C) Type of depository for solid waste disposal proposed for the site; <br />The proposed depository will be a Construction and Debris waste depository with <br />recycling and wood chipping services. <br />(D) Discussion of Depositorys Service Area, Including Transportation Corridors and <br />Surrounding Access <br />The service azea for the depository would potentially include the towns Sedalia, Castle <br />Rock and the surrounding azeas. Transportation routes [o the depository would be as <br />follows: <br />Sedalia: Go north on U.S. Highway 85 approximatelytwo-thirds of a mile. <br />Castle Rock: Go approximately 2 miles north on I-25 to U.S. Highway 85 and then <br />approximately6 miles north on U.S. Highway 85. <br />The depository is located in a remote azea. The only vehiculaz access will be as <br />described above. The facility entrance from Highway 85 will restrict all traffic entering <br />and leaving the facility. The surrounding terrain restricts unauthorized vehiculaz access <br />to the depository azea from the east, south and north. The only access corridor to the <br />depository azea is from the west. Vehicular traffic for the project will be restricted to <br />• the private road access from Highway 85. <br />woine~mva~d.r,r..,,~mooo m~ Sedalia Recycling Center and Depository <br />
The URL can be used to link to this page
Your browser does not support the video tag.