Laserfiche WebLink
~~~ • <br /> <br />BOETTCHER LIMESTONE QUARRY <br />PERDIIT ~~77-348 Page 2 ~ <br />(4) Species, dates, locations of vegetation planted <br />Not applicable at this time. <br />(5) Type and quantity of fertilizers, soil conditioners <br />Not applicable at this time. <br />(6) Appraisal of success of reclamation efforts <br />Not applicable at this time. <br />(7) Estimates of location and number of acres to be <br />a ecte wring coming year <br />The quarrying of "A"-Band material during 1980-51, <br />as shown on Sheets 5 and 6, will be in areas already <br />disturbed by stripping. The major area of new dis- <br />turbance will be in the "C"- and "E"-Band quarry <br />to be opened in the area outlined in yellow on Sheet 3. <br />While this area was disturbed in pre-1976 mining opera- <br />tions, under the terms of HB 1065 it becomes new major <br />disturbance area. It is projected that approximately <br />18 acres will be disturbed during the 1980-81 year. <br />(8) Effective date of information rovided is <br />approximately Octo~l, 1 <br />Signed U~ c ~~4:Q~ <br />Pau E. T omsen <br />Properties Engineer <br />