Laserfiche WebLink
<br />The evaporation system was in operation most of the month. The down time was attributed to <br />routine maintenance or pump repair. <br />As approved by the DMG, water continued to be transported from the evaporation system <br />collection pond to the tailings impoundment via water truck. The total volume moved during the <br />month of September was 5,036,000 gallons. <br />The five flow window wells were all operating at month's end. These five wells are M-18, M-19, M-20, <br />M-28 and M-29. The combined flow from these wells was approximately 99 gpm. <br />Sincerely, _~ p~ <br />4~1 ~~1~U" ~J <br />Ron Zumwalt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />