Laserfiche WebLink
~ 4 <br />K,• -:2 .: <br />w 1.. -. <br />4~ L <br />4" <br /> <br />;DECEIVED <br />~= F B 2 ~ 2005 <br />Mine: <br />f)ivision of Mineials 8 Geoior~~~ <br /> <br />Waste Bank No: RD/T <br />General Description or Reference to Site Plan: <br />^~Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />L°1 New Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />^ Placement of Underdrain(s)" <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />andlordischarge,integrity of 100-year 24-hour appurtenant drainage structures, evidence of positive <br />drainage. <br />~~A..1oPw~t~e/' r1z~SG/'~"rPrts o~0 no~7`- ino~ic~'fe yra.~~w~~ <br />bv; (0(4 p i~ y-~e r~{~s e ~ Sec T ~/~ ~), S,e/c~9c ~s/•rot <br />p bsCrv ~ ;~ 7~ s.~a l~ S/4h~ g6ot,~ '~B 7`~1~.~ ~~c h . <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />/V4 ~~r~r0~94 f ~('i ~( ~~P°~trS ~ haue 6Pc~ ~~9Cc°~ <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Job No. 28,170 Page 1 of 2 <br />