My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP44991
DRMS
>
Back File Migration
>
Report
>
REP44991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:47:35 AM
Creation date
11/27/2007 10:28:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Report
Doc Date
4/15/1999
Doc Name
1998 AHR REVIEW
From
KENT GORHAM
To
JANET BINNS
Annual Report Year
1998
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Janet Binns <br />Page 2 <br />April 15, 1999 <br />FLOW (cfsl <br />May 20, 1998 <br />Site 700 Site 900 700 + 900 Site 29 <br />17 6.4 23.4 5.96 <br />FLOW (cfsl <br />August 3, 1998 <br />Site 700 Site 900 700 + 900 Site 29 <br />1.8 1.9 3.7 6.14 <br />Flow at site 29 should approximate the total flow at site 700 and site 900. As the data from the <br />three sampling episodes indicate, there is considerable difference between the total of site 700 <br />and site 900 and the reading taken at site 29. It is likely that the rating curve at Site 29 is not <br />representative of the actual flow at site 29. <br />Bond Release Findines <br />In accordance with Rule 3.03.2(2), the Division is required to make an evaluation of whether <br />pollution of surface and subsurface waters is occurring, the probability of future occurance of <br />such pollution, and the estimated cost of abating such pollution, prior to releasing any <br />performance bond at a site. <br />Baseline water quantity and quality parameters, and data collected representing existing quality <br />as of January 31, 1994, where available, were compazed to 1998 data for Mine No. 3. <br />Bedrock Water Oualitv <br />Well 008-77-58 is completed in the Wadge overburden downgradient of the reclaimed pit azea. <br />A marked decline in water level in this downgradient well is noted in the data which <br />corresponds to an increase in total dissolved solids in January of 1980, from approximately 300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.