Laserfiche WebLink
<br />' discharges during the following year (MLRD Stipulations <br />' Nos. 13 and 25, OSM Stipulations Nos. 13 and 10}. <br />' o A mine workings map showing one location and quantity <br />' of mine water inflows and a table keyed to the mine map <br />which contains the source, quantity, duration and <br />' quality (pH, specific conductance and temperatures) of <br />all inflows (MLRD Stipulation No. 13, OSM Stipulation <br />' No. 13). <br />' o A table containing records of water discharged from the <br />mine, consumed in the mine and imported for use within <br />the mine (MLRD Stipulation No. 13, OSM Stipulation No. <br />' 13). <br />' Other stipulations outlined specific monitoring requirements to <br />reinforce and expand upon the hydrologic monitoring plan included <br />in the Mt. Gunnison Mining and Reclamation Plan. Hydrologic <br />' monitoring data are submitted to the regulatory authorities quar- <br />t terly. <br />In subsequent discussions with the agency, it was agreed that the <br />annual hydrology reports would be prepared for a water year <br />' (October 1 to September 30) to correspond with the USGS reporting <br />program. <br />1 <br /> <br />-2- <br />