Laserfiche WebLink
1 <br /> <br />' 1.3 Ground Water Monitoring <br />' During Water Year 1983 water levels were monitored <br />monthly at 18 wells when weather permitted. The loca- <br />' tion of these wells are shown on Exhibit I. <br /> The two wells, WR-2 and WR-3 were completed above and <br /> below the initial waste rock pile. Monthly water l evel <br />' <br /> recordings were initiated in September 1981. Well WR-2 <br /> was destroyed in June 1982 during construction of the <br /> parking lot and shop wareho use. A new well, WR-2 was <br />' completed in November, 1982 at a location 49 feet up- <br /> slope of the original well. <br />' <br />Well water level hydrographs from January, 1982 through <br />' Water Year 1983 are provided in Appendix C. Water <br />' levels and corresponding monitoring dates are tabulated <br />in the quarterly monitoring reports. <br />' Wells SOM-38-H-1 and SOM-38-H-2 were obstructed. Ob- <br />structions were cleared in October, 1981. However, <br />both wells, plus wells SOM-2 and SOM-16, have continued <br />' to pose problems in obtaining reliable water level <br />' measurements. At times, heavy condensation in these <br />wells prevents reliable use of the electric sounder. <br /> <br />-9 <br />