Laserfiche WebLink
<br />Pitch Reclamation Project April 29, 2004 <br />2003 Annual Reclamation Report Pape 16 <br />The RTP demolition debris and soils compacted in the Tie Camp Creek Disposal Cell will be <br />covered with a 12 inch sericite clay cap that will be keyed into the clay liner material on the <br />edges. This will be followed by placement of 24 inches on overburden material and revegetated <br />with the mix of grass seed used throughout the property. <br />• Planting of approximately 300 lodge pole seedlings on the face of the Indian Creek waste <br />rock dump; <br />• Continued revegetation of the small catchment basin constructed in 2003 in the drainage <br />near the old RTP area to retard sedimentation; <br />• Noxious weed control; <br />• Monitor water release in accordance with the CWDPS permit; <br />• Conduct monthly and quarterly monitoring and reporting pursuant to the CWDPS permit <br />at compliance point SW-33; <br />• Conduct annual surveys of the slope monitoring monuments; and <br />• Monitor waste rock dumps and sediment control embankment. <br />8.0 REFERENCES <br />Golder Associates, March 1998, Pitch Reclamation Project, Geotechnical Monitoring Activities, 1997 <br />(Source Map). <br />SRK Consulting, Inc., April 2004, Slope Displacement Velocity Vector Analysis for 2003-Pitch <br />Reclamation Project. <br />