Laserfiche WebLink
• ORCHARD VALLEY MIN <br />QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />7. Top of completed fill Y Top of gob has been sloped with no soil cover. <br />has adequate drainage? <br />8. Bench drainage adequate? Y Bench drainage was maintained throughout <br /> soil salvage and gob shipping operations. <br />9. Areas covered with 4' Y Non-combusi[ble matierial was removed from <br />non-toxic non- top of pile to approximatley elevation 66.7. <br />combustible material? <br />10. Berms constructed on out- Y Berm constructed around perimeter of pile <br />slopes? to contain drainage and prevent topsoil <br /> coma ntina[ion. <br />I1. Evidence of svuctural N <br />defects? <br />12. Topsoil adequately sal- Y Topsoil and subsoil salvaged from pile was <br />vaged and stored? stored in newly approved stockpile <br /> location. Piles were stabilized by <br /> seeding/mulching. <br />l3. Trash being removed? Not applicable. <br />14. Additional Comments? N <br />During the ]s[ quarter, 1991, salvage of the Wes[ Ridge Gob Pile was initiated. <br />The gob material was exposed and access was developed to allow the materiel [o be <br />shipped out. Shipping operations were temporarily suspended due [o handling <br />problems caused by excessive moisture in the material. The material currently remains <br />exposed and is to be shipped out prior to August 1, 1991. <br />[ Certify the above report ns being accurate to the best of my belief and knowledge. <br />Dale <br />