Laserfiche WebLink
.~ ~ , q ~i 111111lIlllllllllll <br />ORCHARD VALLEY MIN sss <br />l5 f QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />I. Quantity of waste N There has been no gob hauled to [he waste <br />material added to waste disposal pile this quarter. Topsoil and I <br />disposal area this subsoil was removed to uncover [he gob so <br />quarter. gob could be shipped to the Nucla Power <br /> Plant. <br />2. Waste material deposited N Uppermost 4' of gob was removed and shipped <br />and compacted in 24" out. <br />lifts. <br />3. Drainage alterations Y Drainage on second lever was further <br />constructed. improved to drain water From top of pile to <br /> drainage ditches at the toe of pile. Also <br /> top of pile was shaped so that proper <br /> drainage to ditches would occur. <br />4. Present height of waste Highest height approximately 74.7. <br />material. <br />5. New bench constructed? N Topsoil and subsoil salvage operations have <br /> exposed gob on 2nd level of pile. Gob has <br /> been dozed up in center of pile to <br /> facilitate loading operations. Drainage was <br /> contained within a soil berm around the <br /> perimeter of the exposed level. Drainage <br /> was directed away from the outslopes of the <br /> pile and into the drainage ditch at the toe <br /> of the pile. <br />6. Refuse material outslope Y Slopes have been checked for proper placement. <br />placed at IV:2H? <br />