My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP44627
DRMS
>
Back File Migration
>
Report
>
REP44627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:47:07 AM
Creation date
11/27/2007 10:21:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Report
Doc Date
5/26/1988
Doc Name
SUBMITTAL OF ANNUAL REPORTS FOR CASTLE CONCRETE
From
MARK A HEIFNER
To
MLR
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASTLE CONCRETE COMPANY'S <br />MINED LAND RECLAMATION <br />1987-88 ANNUAL REPORT FOR: SNYDER QUARRY <br />PERMIT NUMBER: M-77-210 <br />REC~~~~ <br />DATE OF INSPECTION FOR DATA IN REPORT: MAY 1988 <br />MAY 2 G 1988 <br />MINED L,41~~ <br />surQURY: liECLAMATf(5N f3W~~ir~fd <br />Between 30 and 35 acres of the permit was affected. All <br />mining occurred in the Phase I area and covered about 5 <br />acres. About 1 acre in Phase 1 was seeded. An amendment <br />was applied for to allow the installation of a washing <br />system at the quarry. The visual berm vegetation is <br />continuing to show good development. <br />RULE 2.41 1 LOCATION AND NUMBER OF ACRES AFFECTED DURING THAT YEAR. <br />Between 30 and 35 acres of land within the permit was affected at one <br />time or another during the past year. Of this about 5 acres was involved <br />directly in the extraction of rock. The remainder of the land was utilized <br />for the transport of the rock from the mining area, access to the mining <br />area, processing of the rock, and stockpiling of the products. <br />As shown on the annual report map, all mining occurred in the Phase I <br />area of the 1984 permit amendment area. Access to the mining area was via <br />a road constructed through the Phase II area. All other activities needed <br />to conduct the operation were contained within the pre-1984 amendment area <br />which is equivalent to the former permit area. <br />RULE 2.41 2 LOCATIONS AND NUMBER OF ACRES RECLAIMED FOR THAT YEAR. <br />The only area placed under reclamation during the past year was about <br />1 acre on the south end of Phase I. This area was partially backfilled, <br />topsoiled and seeded. It was expected that pinyon pine trees would be <br />planted on the area, but our order for trees which was placed with the <br />Colorado State Forest Service was canceled for lack of available <br />material. Therefore, the tree planting will need to be delayed until <br />next year. <br />RULE 2.41 3 THE LOCATION AND NUMBER OF ACRES IN THE VARIOUS STAGES OF <br />RECLAMATION (BACKFILLED, GRADED, TOPSOIL REPLACED, REVEGETATED). <br />Little reclamation has been implemented on this operation. The reason <br />for this lack of reclamation is due to the need to keep nearly all the land <br />which has been affected since the operation began in operation. However, <br />now that the Phase I area is well under way, reclamation of the quarry will <br />Page 1 of 3 1988 SNYDER QUARRY ANNUAL REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.