Laserfiche WebLink
<br />In 1979, a diversion channel and four sedimentation ponds were constructed to <br />divert water away from the main mine facilities. Access roads to the sedimentation <br />ponds and parking lot were also constructed. The revegetation program of 1979 <br />addressed disturbed areas associated with these facilities and encompassed <br />approximately 12 acres of reclamation. <br />Reclamation activities in 1980 focused on revegetation lands disturbed through <br />minor construction activities conducted in 1979. The areas addressed in 1980 <br />included the Orchazd Valley Mine water pipeline, exploration drill pads, and <br />miscellaneous roadways. The majority of the acreage reclaimed in 1980, <br />approximately 3.5 acres, was associated with reclamation of the water pipeline. <br />The 1981 revegetation program encompassed minor disturbances consisting <br />miscellaneous roadways, Steven's Gulch well field structures, and the scale house <br />and truck scales near the truck dump station. <br />Construction of the west ridge waste disposal area was initiated in July, 1983. <br />Lands available for reclamation at this site have been seeded and mulched on an <br />approximate annual basis since development began. The west ridge disposal site <br />encompasses approximately 3.37 acres. Approximately 2.02 acres of this site are <br />currently reclaimed. Reclamation of the old waste disposal site near ponds 1 and 2 <br />was completed in November of 1983. Vegetation was established on this 0.86 acre <br />site the following spring. Development of the west ridge disposal site was initiated <br />in 1983 in conjunction with development of the west material stockpile established <br />to accommodate material being generated from the west ridge development. <br />Reclamation of the Orchard Valley West Mine fill slopes and associated <br />dishirbances was completed by the fall of 1987. Slopes instability necessitated the <br />relocation of topsoil at the mine site and subsequent reseeding and mulching of both <br />the new pile and the old pile footprint. This was completed in the fall of 1990. <br />Several small topsoil piles exist throughout the various disturbance areas of the mine <br />site. Those piles projected to remain undish~rbed for longer than five years are <br />seeded with the permanent seed mixture. Those piles projected to be redistributed <br />within five years aze seeded with the temporary seed mixture. <br />